[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-931064":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},931064,603,2,"多选题","价值工程对象选择的方法有( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","ABC分析法",true,{"key":16,"text":17,"correct":18},"B","歌顿法",false,{"key":20,"text":21,"correct":18},"C","头脑风暴法",{"key":23,"text":24,"correct":14},"D","经验分析法",{"key":26,"text":27,"correct":14},"E","最合适区域法","ADE","价值工程对象选择往往要兼顾定性分析和定量分析，因此，对象选择的方法很多，每种方法又各有一定的特点和适应性。应根据实际情况选用适当的方法，以取得较好的效果。下面介绍几种常用的方法。(1)经验分析法(2)百分比法(3)ABC分析法(4)强制确定法。(5)最合适区域法",{"id":6,"name":31,"category":32,"favorite":33},"质量、投资、进度控制","建筑工程",0]