[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-931052":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},931052,603,1,"单选题","建立故障树时，在确定顶事件之前，应该做的工作是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","定量计算",false,{"key":16,"text":17,"correct":18},"B","故障因果关系分析",true,{"key":20,"text":21,"correct":14},"C","简化系统",{"key":23,"text":24,"correct":14},"D","自上而下逐级建立故障树","",{"id":6,"name":27,"category":28,"favorite":29},"质量、投资、进度控制","建筑工程",0]