[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-931043":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},931043,603,2,"多选题","安装工程定额包括( )定额。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","机械设备安装",true,{"key":16,"text":17,"correct":14},"B","电气设备安装",{"key":19,"text":20,"correct":14},"C","自动化仪表安装",{"key":22,"text":23,"correct":24},"D","电气照明安装",false,{"key":26,"text":27,"correct":14},"E","静置设备与工艺金属结构安装","ABCE","",{"id":6,"name":31,"category":32,"favorite":33},"质量、投资、进度控制","建筑工程",0]