[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-931031":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},931031,603,2,"多选题","对策表的应用过程包括( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","对策措施",false,{"key":16,"text":17,"correct":18},"B","为工序编号。",true,{"key":20,"text":21,"correct":18},"C","确定存在问题。",{"key":23,"text":24,"correct":18},"D","确定对策。",{"key":26,"text":27,"correct":18},"E","确定每种对策的负责人、完成日期","BCDE","",{"id":6,"name":31,"category":32,"favorite":33},"质量、投资、进度控制","建筑工程",0]