[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-602-4":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":612},{"id":5,"name":6,"category":7,"favorite":8},602,"设备监理合同管理","建筑工程",0,4,50,448,[13,34,46,58,70,82,94,106,118,127,139,151,163,175,187,199,211,223,232,244,256,268,280,292,304,316,328,340,352,364,376,388,400,412,424,436,448,460,472,484,496,508,520,532,543,555,567,579,590,602],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},930722,1,"单选题","按照FIDIC新黄皮书对工程接收程序的规定，工程竣工的日期应当是( )。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","承包商完成全部工程的日期",false,{"key":24,"text":25,"correct":22},"B","工程通过竣工试验的日期",{"key":27,"text":28,"correct":22},"C","工程师签发接收证书的日期",{"key":30,"text":31,"correct":32},"D","接收证书中注明的竣工的日期",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},930723,"某建设项目施工招标时，三家投标人组成了联合体参加竞标，最终该联合体中标，应与招标人签订合同的是( )。",[38,40,42,44],{"key":20,"text":39,"correct":22},"联合体",{"key":24,"text":41,"correct":32},"联合体各方",{"key":27,"text":43,"correct":22},"联合体中的牵头人",{"key":30,"text":45,"correct":22},"联合体中的资质较高方",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},930724,"根据《建设工程安全生产管理条例》，下列选项中，属于施工单位应采取的安全措施的是( )。",[50,52,54,56],{"key":20,"text":51,"correct":22},"建设工程施工前，组织设计单位与施工班组进行技术交底",{"key":24,"text":53,"correct":32},"不得在尚未竣工的建筑物内设置员工集体宿舍",{"key":27,"text":55,"correct":22},"实施爆破作业前，向公安机关申请领取《爆破物品使用许可证》",{"key":30,"text":57,"correct":22},"向建设行政主管部门报送安全施工措施的资料",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},930725,"按照国际惯例，如果承包商没有在合同规定的支付时间内收到付款，有权向业主收取延误期的融资费用，计算融资费用的费率是( )。",[62,64,66,68],{"key":20,"text":63,"correct":22},"以银行贷款年利率计算",{"key":24,"text":65,"correct":22},"以高出银行贷款利率的1个百分点的年利率计算",{"key":27,"text":67,"correct":32},"以高出银行贷款利率的2～3个百分点的年利率计算",{"key":30,"text":69,"correct":22},"以高出银行贷款利率的5个百分点的年利率计算",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},930726,"下列关于承包商暂停工作权利的说法，错误的是( )。",[74,76,78,80],{"key":20,"text":75,"correct":32},"如果业主未能按照合同规定的时间支付进度款，承包商即可暂停工作",{"key":24,"text":77,"correct":22},"暂停工作不影响承包商对延迟付款获得融资费用和终止合同的权利用",{"key":27,"text":79,"correct":22},"如果承包商暂停工作致使工期和费用受到影响，工程师应公正确定对承包商的补偿",{"key":30,"text":81,"correct":22},"如果承包商因放慢工作进度致使工期和费用受到影响，可以提出工期延长及补偿费用和利润的要求",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":30,"analysis":33},930727,"某设备工程合同履行期间，业主基于自身利益的考虑而终止合同。业主3月1日发出的终止合同通知于次日到达承包商、业主于3月10日退还履约保证，则该合同终止生效的时间是( )。",[86,88,90,92],{"key":20,"text":87,"correct":22},"3月2日",{"key":24,"text":89,"correct":22},"3月10日",{"key":27,"text":91,"correct":22},"3月30日",{"key":30,"text":93,"correct":32},"4月7日",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},930728,"隐蔽工程在隐蔽前，施工单位应当通知建设单位和( )。",[98,100,102,104],{"key":20,"text":99,"correct":22},"监理单位",{"key":24,"text":101,"correct":22},"设计单位",{"key":27,"text":103,"correct":32},"建设工程质量监督机构",{"key":30,"text":105,"correct":22},"建设行政主管部门",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},930729,"基准点、基准线和基准标高等原始数据使用前，应当采取合理措施验证其准确性的责任方是( )。",[110,112,114,116],{"key":20,"text":111,"correct":22},"工程师",{"key":24,"text":113,"correct":22},"业主",{"key":27,"text":115,"correct":32},"承包商",{"key":30,"text":117,"correct":22},"分包商",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},930730,"FIDIC“新黄皮书”规定，确定竣工试验的具体日期并发出指示的是( )。",[122,123,124,126],{"key":20,"text":113,"correct":22},{"key":24,"text":111,"correct":32},{"key":27,"text":125,"correct":22},"工程师代表",{"key":30,"text":115,"correct":22},{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":30,"analysis":33},930731,"FIDIC新黄皮书对业主最终付款的支付时间的规定是，( )后的56天内支付。",[131,133,135,137],{"key":20,"text":132,"correct":22},"工程师收到最终报表",{"key":24,"text":134,"correct":22},"业主收到结清证明",{"key":27,"text":136,"correct":22},"工程师收到结清证明",{"key":30,"text":138,"correct":32},"业主收到工程师发出的付款证书",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":20,"analysis":33},930732,"下列关于权利与义务对等性的说法，正确的是( )。",[143,145,147,149],{"key":20,"text":144,"correct":32},"合同当事人享有的权利与履行的义务应对等，并与合同的预期目的相匹配",{"key":24,"text":146,"correct":22},"合同当事人相互享有同等的权利",{"key":27,"text":148,"correct":22},"合同当事人相互承担同等的义务",{"key":30,"text":150,"correct":22},"合同当事人一方享有的权利等同对方承担的义务",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":27,"analysis":33},930733,"给付定金的一方不履行约定债务的，无权要求返还定金，接受定金的一方不履行约定债务的，应当( )。",[155,157,159,161],{"key":20,"text":156,"correct":22},"返还定金",{"key":24,"text":158,"correct":22},"抵作合同价款",{"key":27,"text":160,"correct":32},"双倍返还定金",{"key":30,"text":162,"correct":22},"继续履行合同",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":27,"analysis":33},930734,"按照《招标投标法实施条例》的规定，投标人对开标有异议的，应当在( )提出。",[167,169,171,173],{"key":20,"text":168,"correct":22},"开标前",{"key":24,"text":170,"correct":22},"提交投标书时",{"key":27,"text":172,"correct":32},"开标现场",{"key":30,"text":174,"correct":22},"确定招标人前",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":20,"analysis":33},930735,"采用FIDIC合同条件的设备工程合同，“不可预见”被定义为“一个有经验的承包商在( )前不能合理预见”。",[179,181,183,185],{"key":20,"text":180,"correct":32},"提交投标书日期",{"key":24,"text":182,"correct":22},"基准日期",{"key":27,"text":184,"correct":22},"实施工程",{"key":30,"text":186,"correct":22},"进入现场",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":20,"analysis":33},930736,"根据FIDIC《设计采购施工(EP C)／交钥匙工程合同条件》的规定，承包商应在( )仔细审查雇主要求。",[191,193,195,197],{"key":20,"text":192,"correct":32},"基准日期前",{"key":24,"text":194,"correct":22},"基准日期后",{"key":27,"text":196,"correct":22},"开工日期前",{"key":30,"text":198,"correct":22},"开工日期后",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":20,"analysis":33},930737,"根据世界银行《生产设备设计、供应和安装采购标准招标文件》，招标文件包括( )。",[203,205,207,209],{"key":20,"text":204,"correct":32},"招标程序、业主要求以及合同条件和合同格式",{"key":24,"text":206,"correct":22},"投标人须知、招标资料表和投标保函",{"key":27,"text":208,"correct":22},"投标人须知、业主要求和设计文件",{"key":30,"text":210,"correct":22},"招标程序、招标资料表、合同条件和进度计划",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":30,"analysis":33},930738,"设备监理工程师的合同管理对象是( )。",[215,217,219,221],{"key":20,"text":216,"correct":22},"合同内容",{"key":24,"text":218,"correct":22},"设备工程",{"key":27,"text":220,"correct":22},"监理合同",{"key":30,"text":222,"correct":32},"设备合同",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":27,"analysis":33},930739,"因业主提前占用部分工程导致承包商增加费用时，承包商根据索赔程序提出了要求，( )应对补偿金额作出公正的决定。",[227,228,230,231],{"key":20,"text":113,"correct":22},{"key":24,"text":229,"correct":22},"项目经理",{"key":27,"text":111,"correct":32},{"key":30,"text":125,"correct":22},{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":27,"analysis":33},930740,"根据《物权法》，物权分为( )。",[236,238,240,242],{"key":20,"text":237,"correct":22},"所有权、债权和用益物权",{"key":24,"text":239,"correct":22},"动产物权、不动产物权和权利质权",{"key":27,"text":241,"correct":32},"所有权、用益物权和担保物权",{"key":30,"text":243,"correct":22},"抵押权、质权和留置权",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":30,"analysis":33},930741,"下列关于设备工程设计合同委托人违约责任的叙述，错误的是( )。",[248,250,252,254],{"key":20,"text":249,"correct":22},"委托人不履行合同，无权请求返还定金",{"key":24,"text":251,"correct":22},"因委托人变更制造要求而造成设计修改，应依照设计人实际消耗的工作量增付费用",{"key":27,"text":253,"correct":22},"委托人超过合同约定的日期付费时应向设计人偿付逾期违约金",{"key":30,"text":255,"correct":32},"政府主管部门对设计文件不审批，委托人也应支付设计费",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":24,"analysis":33},930742,"执行政府指导价的合同，当事人一方逾期提货时恰遇政府指导价格上涨，应按( )执行",[260,262,264,266],{"key":20,"text":261,"correct":22},"原价格",{"key":24,"text":263,"correct":32},"新价格",{"key":27,"text":265,"correct":22},"原价和新价的平均价格",{"key":30,"text":267,"correct":22},"当地市场价格",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":24,"analysis":33},930743,"债务人将合同的部分义务转让给第三人的，应当( )。",[272,274,276,278],{"key":20,"text":273,"correct":22},"通知债权人",{"key":24,"text":275,"correct":32},"经债权人同意",{"key":27,"text":277,"correct":22},"与第三人约定且经主管部门批准",{"key":30,"text":279,"correct":22},"通知债权人并在合同管理机关备案",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":20,"analysis":33},930744,"如果业主基于自身利益的考虑而提出终止合同，则承包商获得相应付款的根据是( )条款。",[284,286,288,290],{"key":20,"text":285,"correct":32},"不可抗力",{"key":24,"text":287,"correct":22},"索赔",{"key":27,"text":289,"correct":22},"风险与保险",{"key":30,"text":291,"correct":22},"竣工结算",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":20,"analysis":33},930745,"根据FIDIC《生产设备和设计一施工合同条件》，下列关于费用的解释，正确的是( )。",[296,298,300,302],{"key":20,"text":297,"correct":32},"费用是指承包商在现场内或现场外发生(或将发生)的所有开支，包括管理费，但不包括利润",{"key":24,"text":299,"correct":22},"费用是指承包商在现场内发生(或将发生)的所有开支，不包括管理费和利润",{"key":27,"text":301,"correct":22},"费用是指承包商在现场内或现场外发生(或将发生)的所有开支，包括管理费和利润",{"key":30,"text":303,"correct":22},"费用是指承包商在现场内发生(或将发生)的所有开支，包括管理费和利润",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":24,"analysis":33},930746,"设备工程合同的计价方式不同，双方当事人的风险分担不同，承包商承担风险最多的合同计价方式是( )。",[308,310,312,314],{"key":20,"text":309,"correct":22},"工程量清单合同",{"key":24,"text":311,"correct":32},"固定总价合同",{"key":27,"text":313,"correct":22},"成本加固定费用",{"key":30,"text":315,"correct":22},"混合合同",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":27,"analysis":33},930747,"根据《建设工程质量管理条例》，设备安装工程的最低保修期限为( )。",[320,322,324,326],{"key":20,"text":321,"correct":22},"设计文件规定的合理使用年限",{"key":24,"text":323,"correct":22},"双方约定的合理使用年限",{"key":27,"text":325,"correct":32},"2年",{"key":30,"text":327,"correct":22},"5年",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":27,"analysis":33},930748,"由于业主原因造成竣工试验的延误，承包商有权获得的补偿是( )。",[332,334,336,338],{"key":20,"text":333,"correct":22},"竣工时间",{"key":24,"text":335,"correct":22},"费用",{"key":27,"text":337,"correct":32},"费用和利润",{"key":30,"text":339,"correct":22},"竣工时间、费用和利润",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":30,"analysis":33},930749,"质量技术监督部门对许可证获准企业进行监督检查的方式不包括( )。",[344,346,348,350],{"key":20,"text":345,"correct":22},"日常监督检查",{"key":24,"text":347,"correct":22},"定期监督检查",{"key":27,"text":349,"correct":22},"产品质量监督抽查",{"key":30,"text":351,"correct":32},"产品自查自检",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":24,"analysis":33},930750,"《担保法》规定，在留置权的实现过程中，债权人留置财产后，应当确定债务人履行债务的期限不少于( )个月。",[356,358,360,362],{"key":20,"text":357,"correct":22},"1",{"key":24,"text":359,"correct":32},"2",{"key":27,"text":361,"correct":22},"3",{"key":30,"text":363,"correct":22},"4",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":24,"analysis":33},930751,"甲公司与乙公司在合同中约定，乙公司向甲公司购买5台设备，货款由乙公司分别支付给丙公司和甲公司。现乙公司未按约定向丙公司支付货款，导致丙公司遭受损失。乙公司应承担的责任是( )。",[368,370,372,374],{"key":20,"text":369,"correct":22},"向丙公司承担违约责任",{"key":24,"text":371,"correct":32},"向甲公司承担违约责任",{"key":27,"text":373,"correct":22},"向丙公司承担赔偿责任",{"key":30,"text":375,"correct":22},"与甲公司共同向丙公司承担违约责任",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":20,"analysis":33},930752,"下列关于仲裁审理的说法，正确的是( )。",[380,382,384,386],{"key":20,"text":381,"correct":32},"仲裁应当开庭审理，当事人也可以协议书面审理",{"key":24,"text":383,"correct":22},"仲裁应当书面审理，当事人也可以协议开庭审理",{"key":27,"text":385,"correct":22},"仲裁开庭审理的，应当公开审理情况",{"key":30,"text":387,"correct":22},"仲裁开庭审理的，一次开庭必须查明全部案件事实",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":24,"analysis":33},930753,"根据《合同法》，除当事人另有约定外，书面合同的成立时间是( )。",[392,394,396,398],{"key":20,"text":393,"correct":22},"标的物交付时",{"key":24,"text":395,"correct":32},"双方当事人签字或者盖章时",{"key":27,"text":397,"correct":22},"定金支付时",{"key":30,"text":399,"correct":22},"承诺到达时",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":20,"analysis":33},930754,"公开招标与邀请招标在招标程序上的主要差异表现为( )。",[404,406,408,410],{"key":20,"text":405,"correct":32},"是否进行资格预审",{"key":24,"text":407,"correct":22},"是否组织现场考察",{"key":27,"text":409,"correct":22},"是否解答投标单位的质疑",{"key":30,"text":411,"correct":22},"是否公开开标",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":27,"analysis":33},930755,"根据我国《招标投标法》规定，开标由( )主持，邀请所有投标人参加。",[416,418,420,422],{"key":20,"text":417,"correct":22},"招标地建设主管部门",{"key":24,"text":419,"correct":22},"工程项目所在地建设主管部门",{"key":27,"text":421,"correct":32},"招标人",{"key":30,"text":423,"correct":22},"招标代理机构",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":24,"analysis":33},930756,"根据《物权法》的规定，下列关于建设用地使用权的说法，正确的是( )。",[428,430,432,434],{"key":20,"text":429,"correct":22},"建设用地使用权是建设用地使用权人对土地享有占有、使用和收益的权利",{"key":24,"text":431,"correct":32},"建设用地使用权可以在土地的地表、地上或者地下分别设立",{"key":27,"text":433,"correct":22},"设立建设用地使用权，应当采取招标、拍卖等公开竞价的方式出让",{"key":30,"text":435,"correct":22},"建设用地使用权期间届满前，国家不得收回该土地",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":24,"analysis":33},930757,"下列关于投标保证金的说法，符合《招标投标法实施条例》规定的是( )。",[440,442,444,446],{"key":20,"text":441,"correct":22},"投标保证金不得超过投标总价的2%",{"key":24,"text":443,"correct":32},"招标人不得挪用投标保证金",{"key":27,"text":445,"correct":22},"投标保证金不得以支票形式提交",{"key":30,"text":447,"correct":22},"投标保证金有效期应超出投标有效期15天",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":24,"analysis":33},930758,"检核表的核心思想是( )。",[452,454,456,458],{"key":20,"text":453,"correct":22},"确定事件的逻辑关系",{"key":24,"text":455,"correct":32},"持续改进",{"key":27,"text":457,"correct":22},"分析事件的合理性",{"key":30,"text":459,"correct":22},"完整描述事件的全过程",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":27,"analysis":33},930759,"采用数据电文形式订立合同的，合同成立的地点是( )。",[464,466,468,470],{"key":20,"text":465,"correct":22},"发件人的主营业地",{"key":24,"text":467,"correct":22},"发件人的经常居住地",{"key":27,"text":469,"correct":32},"收件人的主营业地",{"key":30,"text":471,"correct":22},"收件人的经常居住地",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":20,"analysis":33},930760,"由于设计人员错误造成设备质量事故损失，设计人除负责采取补救措施外，应( )。",[476,478,480,482],{"key":20,"text":477,"correct":32},"免收直接受损失部分的设计费，并支付赔偿金",{"key":24,"text":479,"correct":22},"重新设计、并支付赔偿金",{"key":27,"text":481,"correct":22},"赔偿委托人的实际损失",{"key":30,"text":483,"correct":22},"支付违约金并赔偿损失",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":27,"analysis":33},930761,"采用FIDIC合同条件的设备工程合同，实施工程的费用发生波动，根据合同的价格调整规定，对因市场价格变化不能完全得到补偿时，( )。",[488,490,492,494],{"key":20,"text":489,"correct":22},"工程师应确定一个费用指数，重新价格调整的数额",{"key":24,"text":491,"correct":22},"获得现行费用指数后，重新计算价格调整的数额",{"key":27,"text":493,"correct":32},"应被认为在中标合同金额中已经包含了这一部分物价波动的风险费",{"key":30,"text":495,"correct":22},"应被认为已经按照合同中规定的调价公式予以了调整",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":30,"analysis":33},930762,"建设单位将自己开发的房地产项目抵押给银行，订立了抵押合同，后来又办理了抵押登记。则( )。",[500,502,504,506],{"key":20,"text":501,"correct":22},"项目转移给银行占有，抵押合同自签订之日起生效",{"key":24,"text":503,"correct":22},"项目转移给银行占有，抵押合同自登记之日起生效",{"key":27,"text":505,"correct":22},"项目不转移占有，抵押合同自签订之日起生效",{"key":30,"text":507,"correct":32},"项目不转移占有，抵押合同自登记之日起生效",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":24,"analysis":33},930763,"在买卖合同中，买受人的义务有( )。",[512,514,516,518],{"key":20,"text":513,"correct":22},"对标的物提供质量保证",{"key":24,"text":515,"correct":32},"受领标的物",{"key":27,"text":517,"correct":22},"对标的物提供权利担保",{"key":30,"text":519,"correct":22},"提供有关单证和资料",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":24,"analysis":33},930764,"合同履行是指合同当事人双方依据( )的规定，实现各自享有的权利，并承担各自的义务。",[524,526,528,530],{"key":20,"text":525,"correct":22},"合同法",{"key":24,"text":527,"correct":32},"合同条款",{"key":27,"text":529,"correct":22},"招投标法",{"key":30,"text":531,"correct":22},"政府采购法",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":27,"analysis":33},930765,"劳动争议仲裁时效期间为( )。",[536,538,540,542],{"key":20,"text":537,"correct":22},"60天",{"key":24,"text":539,"correct":22},"6个月",{"key":27,"text":541,"correct":32},"1年",{"key":30,"text":325,"correct":22},{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":30,"analysis":33},930766,"某建设项目在施工招标中，投标人按照招标文件的要求提交了投标保证金。招标人最迟在( )日内，予以退还投标保证金。",[547,549,551,553],{"key":20,"text":548,"correct":22},"开标后30",{"key":24,"text":550,"correct":22},"完成评标后15",{"key":27,"text":552,"correct":22},"发出中标通知书30",{"key":30,"text":554,"correct":32},"签订施工合同5",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":20,"analysis":33},930767,"合同当事人约定了违约金，也约定了定金。合同履行过程中发生违约后，( )。",[559,561,563,565],{"key":20,"text":560,"correct":32},"未违约一方可以选择定金或违约金要求对方赔偿",{"key":24,"text":562,"correct":22},"违约一方可以选择定金或违约金承担赔偿责任",{"key":27,"text":564,"correct":22},"未违约一方可以同时采用定金和违约金要求对方赔偿",{"key":30,"text":566,"correct":22},"违约金和定金的约定同时无效，需采用其他方式追究违约责任",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":24,"analysis":33},930768,"承包商未遵守对履约保证的相关要求而导致业主终止合同的，业主应提前( )天通知承包商。",[571,573,575,577],{"key":20,"text":572,"correct":22},"10",{"key":24,"text":574,"correct":32},"14",{"key":27,"text":576,"correct":22},"20",{"key":30,"text":578,"correct":22},"28",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":30,"analysis":33},930769,"某施工企业在异地设有分公司，分公司受其委托与材料供应商订立了采购合同。材料交货后货款未支付，供应商应以( )为被告人向人民法院起诉，要求支付材料款。",[583,584,586,588],{"key":20,"text":99,"correct":22},{"key":24,"text":585,"correct":22},"分公司",{"key":27,"text":587,"correct":22},"建设单位",{"key":30,"text":589,"correct":32},"施工企业",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":20,"analysis":33},930770,"单位工程的竣工试验，承包商由于业主应负责的原因遇到妨碍达14天以上，正确的处理方法是( )。",[594,596,598,600],{"key":20,"text":595,"correct":32},"视为在竣工试验本应完成的日期业主已接收了该单位工程",{"key":24,"text":597,"correct":22},"视为在竣工试验本应完成的日期承包商已完成了竣工试验",{"key":27,"text":599,"correct":22},"工程师应另行通知承包商进行竣工试验的日期",{"key":30,"text":601,"correct":22},"承包商可自行完成竣工试验",{"id":603,"libraryId":5,"type":15,"typeLabel":16,"stem":604,"options":605,"answer":20,"analysis":33},930771,"生产设备在运输过程中涉及的各类保险，应由( )负责办理投保手续。",[606,607,608,610],{"key":20,"text":115,"correct":32},{"key":24,"text":113,"correct":22},{"key":27,"text":609,"correct":22},"承运人",{"key":30,"text":611,"correct":22},"设备供应商",[613,616,619,622,625,628],{"id":15,"name":614,"category":7,"favorite":615},"领导干部任职前廉政法规知识测试题",92,{"id":617,"name":618,"category":7,"favorite":15},595,"建筑结构与设备",{"id":620,"name":621,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":623,"name":624,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":626,"name":627,"category":7,"favorite":8},534,"BIM工程师",{"id":629,"name":627,"category":7,"favorite":8},535]