[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930959":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},930959,602,2,"多选题","设备安装调试合同发包人义务包括( )。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","办理土地征用",true,{"key":16,"text":17,"correct":14},"B","平整安装调试场地",{"key":19,"text":20,"correct":21},"C","派出现场服务人员",false,{"key":23,"text":24,"correct":14},"D","组织承包人和设计单位进行图纸会审和设计交底",{"key":26,"text":27,"correct":21},"E","技术交底","ABD","CE属于承包商义务。",{"id":6,"name":31,"category":32,"favorite":33},"设备监理合同管理","建筑工程",0]