[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930952":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},930952,602,2,"多选题","在设备工程安装合同中，发包人的义务主要有( )。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","办理土地征用、拆迁补偿等事宜",true,{"key":16,"text":17,"correct":14},"B","开通安装调试场地与城乡公共道路的通道",{"key":19,"text":20,"correct":14},"C","办理安装调试许可证",{"key":22,"text":23,"correct":14},"D","组织承包人和设计单位进行图纸会审和设计交底",{"key":25,"text":26,"correct":27},"E","对安装调试的重要工序进行确认",false,"ABCD","E属于承包商义务。",{"id":6,"name":31,"category":32,"favorite":33},"设备监理合同管理","建筑工程",0]