[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930927":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},930927,602,2,"多选题","采用FIDIC合同条件的设备工程合同，属于不可抗力的情况有( )。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","国家间的战争",true,{"key":16,"text":17,"correct":14},"B","工程所在国的内乱或内战",{"key":19,"text":20,"correct":21},"C","承包商人员引起的骚乱、罢工",false,{"key":23,"text":24,"correct":14},"D","非承包商使用或造成的军火、爆炸、辐射、污染",{"key":26,"text":27,"correct":21},"E","不利的气候条件","ABD","",{"id":6,"name":31,"category":32,"favorite":33},"设备监理合同管理","建筑工程",0]