[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930919":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},930919,602,2,"多选题","设计人对所承担设计任务的设备工程，应依照合同规定配合安装调试或者进行安装前技术交底，解决装配中的有关( )问题。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","装配人员的配备",false,{"key":16,"text":17,"correct":18},"B","设计",true,{"key":20,"text":21,"correct":18},"C","设计变更",{"key":23,"text":24,"correct":14},"D","其他协助",{"key":26,"text":27,"correct":18},"E","修改预算","BCE","设计人对所承担设计任务的设备工程应依照合同规定配合安装调试或者进行安装前技术交底，解决装配中的有关设计问题，负责设计变更和修改预算，参加工程竣工验收。",{"id":6,"name":31,"category":32,"favorite":33},"设备监理合同管理","建筑工程",0]