[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930890":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},930890,602,2,"多选题","总体策划设备工程项目整个建设期内可能签订的合同时，主要依据包括( )。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","相关法律法规",true,{"key":16,"text":17,"correct":14},"B","设备工程的特性",{"key":19,"text":20,"correct":21},"C","设计文件",false,{"key":23,"text":24,"correct":14},"D","资源情况",{"key":26,"text":27,"correct":14},"E","市场环境","ABDE","",{"id":6,"name":31,"category":32,"favorite":33},"设备监理合同管理","建筑工程",0]