[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930874":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},930874,602,2,"多选题","因不可抗力终止合同时，工程师签发的支付证书中应包括( )。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","已经完成的任何工作的价值",true,{"key":16,"text":17,"correct":14},"B","承包商为完成工程而招致的任何合理开支",{"key":19,"text":20,"correct":14},"C","承包商将临时工程或施工设备运回原驻地的费用",{"key":22,"text":23,"correct":14},"D","合同终止时承包商人员遣返回原驻地的费用",{"key":25,"text":26,"correct":27},"E","合同终止所导致的承包商的利润损失",false,"ABCD","",{"id":6,"name":31,"category":32,"favorite":33},"设备监理合同管理","建筑工程",0]