[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930855":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},930855,602,2,"多选题","设备工程合同管理中进度管理的要点主要包括( )。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","工程开工",true,{"key":16,"text":17,"correct":14},"B","工程暂停",{"key":19,"text":20,"correct":14},"C","竣工时间的延长",{"key":22,"text":23,"correct":14},"D","赶工",{"key":25,"text":26,"correct":27},"E","误期损害赔偿",false,"ABCD","",{"id":6,"name":31,"category":32,"favorite":33},"设备监理合同管理","建筑工程",0]