[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930814":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},930814,602,1,"单选题","如果业主拟对其资金安排作任何重要改变，业主应提前通知( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","承包商",true,{"key":16,"text":17,"correct":18},"B","项目经理",false,{"key":20,"text":21,"correct":18},"C","工程师",{"key":23,"text":24,"correct":18},"D","工程师代表","",{"id":6,"name":27,"category":28,"favorite":29},"设备监理合同管理","建筑工程",0]