[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930809":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},930809,602,1,"单选题","在( )后，承包商应清除并运走所有承包商的设备、剩余材料以及残物、垃圾和临时工程，使现场和工程处于清洁、安全的状态。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","工程竣工",false,{"key":16,"text":17,"correct":14},"B","业主接收工程",{"key":19,"text":20,"correct":21},"C","签发工程接收证书",true,{"key":23,"text":24,"correct":14},"D","签发履约证书","",{"id":6,"name":27,"category":28,"favorite":29},"设备监理合同管理","建筑工程",0]