[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930736":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},930736,602,1,"单选题","根据FIDIC《设计采购施工(EP C)／交钥匙工程合同条件》的规定，承包商应在( )仔细审查雇主要求。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","基准日期前",true,{"key":16,"text":17,"correct":18},"B","基准日期后",false,{"key":20,"text":21,"correct":18},"C","开工日期前",{"key":23,"text":24,"correct":18},"D","开工日期后","根据FIDIC《设计采购施工(EPC)／交钥匙工程合同条件》通用条件规定：承包商应在基准日期前仔细审查雇主要求。",{"id":6,"name":27,"category":28,"favorite":29},"设备监理合同管理","建筑工程",0]