[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930718":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},930718,602,1,"单选题","业主为了确保设备工程合同有效并顺利实施，在正式签署设备工程合同前，要求中标的承包商提供履约担保，该履约担保一般是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","银行保函",true,{"key":16,"text":17,"correct":18},"B","汇票",false,{"key":20,"text":21,"correct":18},"C","土地所有权",{"key":23,"text":24,"correct":18},"D","债券","履约担保一般是银行出具的保函或担保公司的保证书。",{"id":6,"name":27,"category":28,"favorite":29},"设备监理合同管理","建筑工程",0]