[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930703":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},930703,602,1,"单选题","某一必须招标的施工项目，采用综合评估法评标。评标委员会经评审，推荐的3名中标候选人：甲报价1000万元，评标得分96；乙报价980万元，评标得分90，丙报价950万元，评标得分95。下列关于中标人的确定和合同金额的说法，正确的是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","中标人为甲，合同价为950万元",false,{"key":16,"text":17,"correct":18},"B","中标人为甲，合同价为1000万元",true,{"key":20,"text":21,"correct":14},"C","中标人为丙，合同价为950万元",{"key":23,"text":24,"correct":14},"D","中标人为乙，合同价为980万元","",{"id":6,"name":27,"category":28,"favorite":29},"设备监理合同管理","建筑工程",0]