[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930685":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},930685,602,1,"单选题","设备工程安装合同中的性能验收( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","由采购方负责，供货方参加",true,{"key":16,"text":17,"correct":18},"B","由供货方负责，采购方参加",false,{"key":20,"text":21,"correct":18},"C","由采购方会同监理人员一并参加",{"key":23,"text":24,"correct":18},"D","由供货方会同监理人员一并参加","由于合同规定的性能验收时间采购方已正式投产运行，这项验收试验由采购方负责，供货方参加。",{"id":6,"name":27,"category":28,"favorite":29},"设备监理合同管理","建筑工程",0]