[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930665":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},930665,602,1,"单选题","下列关于分包商的说法，正确的是( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","承包商选择的材料供应商应取得工程师的事先同意",false,{"key":16,"text":17,"correct":14},"B","承包商拟分包工程，应提前28天通知工程师",{"key":19,"text":20,"correct":21},"C","承包商应当对指定分包商的行为负责",true,{"key":23,"text":24,"correct":14},"D","承包商可将整个工程分包给他人","",{"id":6,"name":27,"category":28,"favorite":29},"设备监理合同管理","建筑工程",0]