[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930656":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},930656,602,1,"单选题","承包商的设计、承包商文件、工程的实施和完成，均应遵守的相关法律法规、技术标准和规范的版本，这些版本是指在( )时正在使用的。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","基准日期",true,{"key":16,"text":17,"correct":18},"B","投标截止日期",false,{"key":20,"text":21,"correct":18},"C","中标通知到达承包商",{"key":23,"text":24,"correct":18},"D","开工日期","",{"id":6,"name":27,"category":28,"favorite":29},"设备监理合同管理","建筑工程",0]