[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930647":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},930647,602,1,"单选题","如果业主打算更换工程师，应提前( )天向承包商通知有关拟替换的工程师信息。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","14",false,{"key":16,"text":17,"correct":14},"B","28",{"key":19,"text":20,"correct":14},"C","35",{"key":22,"text":23,"correct":24},"D","42",true,"",{"id":6,"name":27,"category":28,"favorite":29},"设备监理合同管理","建筑工程",0]