[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930632":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},930632,602,1,"单选题","FIDIC新黄皮书规定，如果修补任何缺陷或损害的工作可能影响工程的性能时，工程师可在修补缺陷或损害后( )天内要求重新进行合同中提出的任何试验，包括竣工试验和(或)竣工后试验。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","7",false,{"key":16,"text":17,"correct":14},"B","14",{"key":19,"text":20,"correct":14},"C","21",{"key":22,"text":23,"correct":24},"D","28",true,"",{"id":6,"name":27,"category":28,"favorite":29},"设备监理合同管理","建筑工程",0]