[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930628":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},930628,602,1,"单选题","甲给乙发的要约中表明：“本要约9月10日前答复有效”，乙在9月5日以电报的方式作出承诺，但由于邮局的原因，直到9月13日甲才收到电报，甲立即给乙打电话称不接受该承诺。根据题义，下列表述正确的是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","承诺迟延但有效",false,{"key":16,"text":17,"correct":18},"B","承诺迟延且无效",true,{"key":20,"text":21,"correct":14},"C","承诺超期但有效",{"key":23,"text":24,"correct":14},"D","承诺超期且无效","乙及时作出承诺，不属于承诺超期，所以CD不对。受要约人在承诺期限内发出承诺，按照通常情形能够及时到达要约人，但因其他原因承诺到达要约人时超过承诺期限的，除要约人及时通知受要约人因承诺超过期限不接受该承诺的以外，该承诺有效。",{"id":6,"name":27,"category":28,"favorite":29},"设备监理合同管理","建筑工程",0]