[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930615":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},930615,602,1,"单选题","由于变更计划、制造要求而造成设计工作的返工、停工、窝工或修改时，委托人应( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","按照合同约定支付设计费",false,{"key":16,"text":17,"correct":18},"B","依照设计人实际消耗的工作量增付费用",true,{"key":20,"text":21,"correct":14},"C","与设计人就设计费用问题重新协商",{"key":23,"text":24,"correct":14},"D","偿付逾期违约金","由于变更计划、制造要求、提供的资料不正确、未如期提供设计工作必须的资料或工作条件，因而造成设计工作的返工、停工、窝工，或修改时，委托人应依照设计人实际消耗的工作量增付费用。",{"id":6,"name":27,"category":28,"favorite":29},"设备监理合同管理","建筑工程",0]