[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930605":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},930605,602,1,"单选题","承包商向工程师提交承包商在履行合同过程中的各类人员的数量以及每类施工设备的数量的时间周期是( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","1周",false,{"key":16,"text":17,"correct":14},"B","2周",{"key":19,"text":20,"correct":21},"C","1个月",true,{"key":23,"text":24,"correct":14},"D","2个月","",{"id":6,"name":27,"category":28,"favorite":29},"设备监理合同管理","建筑工程",0]