[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930599":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},930599,602,1,"单选题","缺陷通知期的起始日期是( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","工程通过竣工试验的日期",false,{"key":16,"text":17,"correct":14},"B","工程师颁发接收证书的日期",{"key":19,"text":20,"correct":14},"C","承包商竣工试验申请书中注册的竣工日期",{"key":22,"text":23,"correct":24},"D","接收证书上标明的竣工日期",true,"",{"id":6,"name":27,"category":28,"favorite":29},"设备监理合同管理","建筑工程",0]