[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930598":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},930598,602,1,"单选题","根据FIDIC《生产设备和设计-施工合同条件》的规定，承包商应为工程、生产设备、材料和承包商文件投保，保险的有效期应从( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","开工日期起到颁发工程接收证书止",true,{"key":16,"text":17,"correct":18},"B","开工日期起到颁发最终付款证书止",false,{"key":20,"text":21,"correct":18},"C","基准日期起到颁发工程接收证书止",{"key":23,"text":24,"correct":18},"D","基准日期起到颁发最终付款证书止","保险的有效期应从开工日期起到颁发工程接受证书止，但是必须涵盖直至颁发履约证书为止的由承包商引起的损害。",{"id":6,"name":27,"category":28,"favorite":29},"设备监理合同管理","建筑工程",0]