[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930595":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},930595,602,1,"单选题","在设备采购合同中，因买受人原因致使设备不能按照约定期限交付的，买受人应当自( )之日起承担标的物毁损、灭失的风险。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","合同成立",false,{"key":16,"text":17,"correct":14},"B","合同签订",{"key":19,"text":20,"correct":14},"C","合同生效",{"key":22,"text":23,"correct":24},"D","违反约定",true,"设备风险承担：因买受人的原因致使设备不能按照约定的期限交付的，买受人应当自违反约定之日起承担标的物毁损、灭失的风险。",{"id":6,"name":27,"category":28,"favorite":29},"设备监理合同管理","建筑工程",0]