[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-601-8":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":620},{"id":5,"name":6,"category":7,"favorite":8},601,"设备工程监理基础及相关知识","建筑工程",0,8,50,686,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,381,393,405,417,429,441,452,464,476,488,500,512,524,536,548,560,572,584,596,608],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},930236,1,"单选题","承担设备工程监理任务时，设备工程监理人员应承诺并书面保证的内容不包括( )。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","与被监理任务无任何商业关系",false,{"key":24,"text":25,"correct":22},"B","未曾与被监理方发生聘用合同关系或已解除聘用合同关系已连续一段时间",{"key":27,"text":28,"correct":22},"C","与被监理单位的直接责任人无亲属关系",{"key":30,"text":31,"correct":32},"D","服务期后不受聘于被监理方",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},930237,"( )是项目管理的职能之一，是项目管理的基础。",[38,40,42,44],{"key":20,"text":39,"correct":32},"项目计划",{"key":24,"text":41,"correct":22},"项目组织",{"key":27,"text":43,"correct":22},"项目控制",{"key":30,"text":45,"correct":22},"项目沟通",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},930238,"国产非标准设备原价的确定可采用( )等方法。",[50,52,54,56],{"key":20,"text":51,"correct":32},"成本计算估价法和系列设备插入估价法",{"key":24,"text":53,"correct":22},"成本计算估价法和概算指标法",{"key":27,"text":55,"correct":22},"分部组合估价法和百分比法",{"key":30,"text":57,"correct":22},"概算指标法和定额估价法",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":30,"analysis":33},930239,"设备的寿命周期是指设备从决策.规划.设计.制造.安装.调试和试运行.使用.维护.修理.改造和更新.调拨.调整，直至报废的全部过程。无论哪一阶段的工作，都应从( )的角度考虑问题，如在规划和设计过程中，要考虑未来使用过程中的可靠性和可维护性，在考虑费用控制时，应考虑降低全寿命周期的费用。",[62,64,66,68],{"key":20,"text":63,"correct":22},"经济寿命周期",{"key":24,"text":65,"correct":22},"使用寿命周期",{"key":27,"text":67,"correct":22},"技术寿命周期",{"key":30,"text":69,"correct":32},"全寿命周期",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},930240,"设备的规划、设计、采购、制造、安装、调试等设备形成的全过程和\u002F或最终形成的结果，我们统称为( )。",[74,76,78,80],{"key":20,"text":75,"correct":22},"设备监理",{"key":24,"text":77,"correct":22},"设备工程项目",{"key":27,"text":79,"correct":32},"设备工程",{"key":30,"text":81,"correct":22},"设备形成过程",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":30,"analysis":33},930241,"管理项目团队属于项目( )管理的内容。",[86,88,90,92],{"key":20,"text":87,"correct":22},"范围",{"key":24,"text":89,"correct":22},"时间",{"key":27,"text":91,"correct":22},"沟通",{"key":30,"text":93,"correct":32},"人力资源",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},930242,"在设备监理工作程序中，紧接着“根据设备工程进度分专业编制设备监理实施细则”工作的应该是( )。",[98,100,102,104],{"key":20,"text":99,"correct":22},"建立设备监理机构",{"key":24,"text":101,"correct":32},"组织监理交底会，配合业主召开各方协调会",{"key":27,"text":103,"correct":22},"组织设备工程初验，参与竣工验收和交付使用，签署监理单位意见",{"key":30,"text":105,"correct":22},"整理资料，向业主提交设备监理档案资料",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},930243,"在风险因素中，设备本身的设计缺陷属于( )。",[110,112,114,116],{"key":20,"text":111,"correct":32},"客观风险因素",{"key":24,"text":113,"correct":22},"道德风险因素",{"key":27,"text":115,"correct":22},"心理风险因素",{"key":30,"text":117,"correct":22},"环境风险因素",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},930244,"根据风险管理人员是否意识到风险的情况，可以将风险接受对策分为( )。",[122,124,126,128],{"key":20,"text":123,"correct":32},"计划性风险接受和非计划性风险接受",{"key":24,"text":125,"correct":22},"预见性风险接受和非预见性风险接受",{"key":27,"text":127,"correct":22},"可控性风险接受和非可控性风险接受",{"key":30,"text":129,"correct":22},"可调整性风险接受和不可调整性风险接受",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},930245,"建立设备工程监理机构首先应做的是确定设备工程监理机构的( )。",[134,136,138,140],{"key":20,"text":135,"correct":32},"目标",{"key":24,"text":137,"correct":22},"内部各部门的任务",{"key":27,"text":139,"correct":22},"人员安排",{"key":30,"text":141,"correct":22},"组织结构模式",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},930246,"申请参加注册设备监理师执业资格考试的人员，取得工程技术专业大学本科学历的，累计从事设备工程专业工作应满( )年。",[146,148,150,152],{"key":20,"text":147,"correct":22},"5",{"key":24,"text":149,"correct":32},"10",{"key":27,"text":151,"correct":22},"15",{"key":30,"text":153,"correct":22},"20",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":30,"analysis":33},930247,"设备工程监理服务特性是指监理服务满足顾客和相关方明确和隐含要求的一组固有特性，是监理( )的结果和反映。",[158,160,162,164],{"key":20,"text":159,"correct":22},"服务内容检查",{"key":24,"text":161,"correct":22},"市场开发",{"key":27,"text":163,"correct":22},"服务设计",{"key":30,"text":165,"correct":32},"服务提供",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":30,"analysis":33},930248,"设备工程监理投标文件中的综合说明一般包括总体承诺、关于资格的声明及( )。",[170,172,174,176],{"key":20,"text":171,"correct":22},"关于项目背景的说明",{"key":24,"text":173,"correct":22},"主要合同条件",{"key":27,"text":175,"correct":22},"服务提要",{"key":30,"text":177,"correct":32},"关于能力的说明",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},930249,"当设备工程项目有多个监理单位共同监理时，监理单位之间应建立( )的协调制度，共同完成监理任务。",[182,184,186,188],{"key":20,"text":183,"correct":22},"监理单位负责人",{"key":24,"text":185,"correct":32},"总监理工程师",{"key":27,"text":187,"correct":22},"专业监理工程师",{"key":30,"text":189,"correct":22},"总监理工程师代表",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":27,"analysis":33},930250,"总监理工程师在设备工程监理的组织协调中( )。",[194,196,198,200],{"key":20,"text":195,"correct":22},"处于领导地位",{"key":24,"text":197,"correct":22},"担任联络人",{"key":27,"text":199,"correct":32},"处于中心地位",{"key":30,"text":201,"correct":22},"作为业主方代表",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},930251,"国际上常见的工程担保种类中，担保金额最大是( )。",[206,208,210,212],{"key":20,"text":207,"correct":22},"投资担保",{"key":24,"text":209,"correct":32},"履约担保",{"key":27,"text":211,"correct":22},"维修担保",{"key":30,"text":213,"correct":22},"进口物资税担保",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},930252,"在设备工程项目中，除客观因素的意外风险外，引起物流系统冲突的决定性因素是( )",[218,220,222,224],{"key":20,"text":219,"correct":22},"设备监理单位的监督能力",{"key":24,"text":221,"correct":32},"各承包商和业主的行为",{"key":27,"text":223,"correct":22},"设备监理单位的协调能力",{"key":30,"text":225,"correct":22},"政府部门的监管能力",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":30,"analysis":33},930253,"在一个管理组织中，自上而 F，权力由大到小，由宏观到微观，由笼统到具体。这体现了组织设计的( )。",[230,232,234,236],{"key":20,"text":231,"correct":22},"权力分散与守恒原则",{"key":24,"text":233,"correct":22},"统一指挥原则",{"key":27,"text":235,"correct":22},"分工与合作原则",{"key":30,"text":237,"correct":32},"权力层次原则",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":27,"analysis":33},930254,"设备工程项目信息按照项目信息来源分类，可以分为( )。",[242,244,246,248],{"key":20,"text":243,"correct":22},"投资控制信息、进度控制信息、质量控制信息和合同管理信息",{"key":24,"text":245,"correct":22},"静态信息和动态信息",{"key":27,"text":247,"correct":32},"项目内部信息和项目外部信息",{"key":30,"text":249,"correct":22},"设备设计过程信息、设备采购过程信息、设备制造过程信息、设备安装过程信息和没备调试过程信息",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":27,"analysis":33},930255,"下列关于风险转移对策的说法，错误的是( )。",[254,256,258,260],{"key":20,"text":255,"correct":22},"风险转移是项目风险管理中广泛采用的一项对策",{"key":24,"text":257,"correct":22},"风险转移是将风险转移给另一方来承担",{"key":27,"text":259,"correct":32},"转移风险可以有效减少风险的危害程度",{"key":30,"text":261,"correct":22},"风险转移包括工程保险方式和合同转移方式",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":27,"analysis":33},930256,"下列关于设备工程监理资料的说法，错误的是( )。",[266,268,270,272],{"key":20,"text":267,"correct":22},"设备工程监理资料是监理单位在实施监理服务的过程中形成的各类文件和记录",{"key":24,"text":269,"correct":22},"监理资料是监理项目信息的载体，记录了所监理项目过程质量状况和发生的问题及处理情况",{"key":27,"text":271,"correct":32},"设备工程监理资料并不能作为界定监理责任的依据",{"key":30,"text":273,"correct":22},"监理资料的管理包括日常管理和归档管理",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":24,"analysis":33},930257,"某些风险在一定的空间和时间范围内消失，新的风险又会产生，这说明风险具备( )特征。",[278,280,282,284],{"key":20,"text":279,"correct":22},"普遍性",{"key":24,"text":281,"correct":32},"风险的可变性",{"key":27,"text":283,"correct":22},"具体风险的偶然性",{"key":30,"text":285,"correct":22},"大量风险发生的规律性",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":27,"analysis":33},930258,"劳动保险费属于( )。",[290,292,294,296],{"key":20,"text":291,"correct":22},"人工费",{"key":24,"text":293,"correct":22},"措施费",{"key":27,"text":295,"correct":32},"企业管理费",{"key":30,"text":297,"correct":22},"建设单位管理费",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":30,"analysis":33},930259,"目标管理的主要工作阶段为目标的设置、实现目标过程的管理和( )。",[302,304,306,308],{"key":20,"text":303,"correct":22},"目标责任分解",{"key":24,"text":305,"correct":22},"目标修改与调整",{"key":27,"text":307,"correct":22},"目标管理制度制定",{"key":30,"text":309,"correct":32},"所取得成果的测定与评价",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":20,"analysis":33},930260,"下列选项中，属于监理工程师责任风险转移措施的是( )。",[314,316,318,320],{"key":20,"text":315,"correct":32},"投保职业责任险",{"key":24,"text":317,"correct":22},"完善法律体系",{"key":27,"text":319,"correct":22},"提高管理水平",{"key":30,"text":321,"correct":22},"严格履行合同",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":27,"analysis":33},930261,"没备工程监理服务提供规范相当于生产制造业的( )。",[326,328,330,332],{"key":20,"text":327,"correct":22},"设计依据",{"key":24,"text":329,"correct":22},"制造图纸",{"key":27,"text":331,"correct":32},"工艺规程",{"key":30,"text":333,"correct":22},"验收标准",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":24,"analysis":33},930262,"在组织中，每个功能部门都是一个权力结点，组织内部的命令通过各功能结点发布、传递和执行，同时每个功能部门又都有相应责任，这体现了( )原则。",[338,340,342,344],{"key":20,"text":339,"correct":22},"权力层次性",{"key":24,"text":341,"correct":32},"职责与权力一致",{"key":27,"text":343,"correct":22},"分工与合作",{"key":30,"text":345,"correct":22},"责任不可下推",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":30,"analysis":33},930263,"设备监理单位在设备监理活动中具有组织有关各方协作、配合的职能，同时是合同管理的主要承担者，具有调解有关各方之间权益矛盾、维护合同双方合法权益的职能。为使这些职能得以实施，设备监理单位必须坚持其( )。",[350,352,354,356],{"key":20,"text":351,"correct":22},"规范性",{"key":24,"text":353,"correct":22},"专业性",{"key":27,"text":355,"correct":22},"公正性",{"key":30,"text":357,"correct":32},"独立性",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":27,"analysis":33},930264,"下列关于设备工程监理组织协调对象的表述，正确的是( )。",[362,364,366,368],{"key":20,"text":363,"correct":22},"业主与政府部门之间的利益冲突",{"key":24,"text":365,"correct":22},"业主与金融机构之间的利益冲突",{"key":27,"text":367,"correct":32},"业主与承包商之间的利益冲突",{"key":30,"text":369,"correct":22},"承包商与保险机构之间的利益冲突",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":24,"analysis":33},930265,"下列选项中，不属于设备工程监理服务实现基本过程的是( )过程。",[374,375,377,379],{"key":20,"text":161,"correct":22},{"key":24,"text":376,"correct":32},"服务绩效改进",{"key":27,"text":378,"correct":22},"监理服务策划",{"key":30,"text":380,"correct":22},"监理服务提供",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":20,"analysis":33},930266,"下列选项中，不属于项目目标管理工作程序的是( )。",[385,387,389,391],{"key":20,"text":386,"correct":32},"评估目标",{"key":24,"text":388,"correct":22},"信息反馈及处理",{"key":27,"text":390,"correct":22},"检查实施结果及奖惩",{"key":30,"text":392,"correct":22},"制定目标",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":30,"analysis":33},930267,"设备工程项目监理服务过程与方法中诊断的目的是( )。",[397,399,401,403],{"key":20,"text":398,"correct":22},"及时发现问题",{"key":24,"text":400,"correct":22},"验证被监理方履行合同的行为和结果是否满足质量要求",{"key":27,"text":402,"correct":22},"对需要纠偏的项目内容督促被监理方及时纠偏",{"key":30,"text":404,"correct":32},"对不符合要求的行为和结果提出处理和解决方案",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":24,"analysis":33},930268,"某工作最乐观估计时间为10天，最悲观估计时间为14天，最可能估计时间为12天，那么该工作持续时间为( )天。",[409,411,413,415],{"key":20,"text":410,"correct":22},"11",{"key":24,"text":412,"correct":32},"12",{"key":27,"text":414,"correct":22},"13",{"key":30,"text":416,"correct":22},"14",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":24,"analysis":33},930269,"设备监理工程师所从事的设备工程监理工作实质上属于( )的范畴。",[421,423,425,427],{"key":20,"text":422,"correct":22},"施工管理",{"key":24,"text":424,"correct":32},"项目管理",{"key":27,"text":426,"correct":22},"决策管理",{"key":30,"text":428,"correct":22},"技术支持",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":27,"analysis":33},930270,"国际货物运输保险是一种( )。",[433,435,437,439],{"key":20,"text":434,"correct":22},"规避风险的保险",{"key":24,"text":436,"correct":22},"强制性保险",{"key":27,"text":438,"correct":32},"自愿性保险",{"key":30,"text":440,"correct":22},"缓解风险的保险",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":24,"analysis":33},930271,"设备工程监理资料是界定监理( )的凭据。",[445,446,448,450],{"key":20,"text":87,"correct":22},{"key":24,"text":447,"correct":32},"责任",{"key":27,"text":449,"correct":22},"任务",{"key":30,"text":451,"correct":22},"大纲",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":20,"analysis":33},930272,"设备工程项目合同是项目业主为了投资建设或其他目的，与承包商、服务商等为完成某一特定的项目任务所订立的( )。",[456,458,460,462],{"key":20,"text":457,"correct":32},"权利义务关系的协议",{"key":24,"text":459,"correct":22},"合同款支付协议",{"key":27,"text":461,"correct":22},"技术协议",{"key":30,"text":463,"correct":22},"采购协议",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":27,"analysis":33},930273,"设备工程包括设备效能的形成、维持、改善和( )的过程和结果。",[468,470,472,474],{"key":20,"text":469,"correct":22},"报废",{"key":24,"text":471,"correct":22},"改造",{"key":27,"text":473,"correct":32},"提高",{"key":30,"text":475,"correct":22},"修理",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":27,"analysis":33},930274,"设备工程监理服务能力测量主要是项目监理机构在提供特定项目监理服务过程中所表现出的专业技术能力、协调管理能力、监督管理能力和附加服务能力等进行测量。监理服务能力测量的依据是设备监理( )。",[480,482,484,486],{"key":20,"text":481,"correct":22},"合同行为",{"key":24,"text":483,"correct":22},"服务水平",{"key":27,"text":485,"correct":32},"服务规划",{"key":30,"text":487,"correct":22},"组织结构",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":30,"analysis":33},930275,"在开展设备工程监理活动时，代表业主方利益的设备监理工程师必须从( )的角度考虑问题，以确保设备工程的综合效益。",[492,494,496,498],{"key":20,"text":493,"correct":22},"设备建设寿命周期",{"key":24,"text":495,"correct":22},"设备物理寿命周期",{"key":27,"text":497,"correct":22},"设备技术寿命周期",{"key":30,"text":499,"correct":32},"设备全寿命周期",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":30,"analysis":33},930276,"关于设备监理与建设监理的关系，说法不正确的是( )。",[504,506,508,510],{"key":20,"text":505,"correct":22},"设备工程监理与建设工程监理之间最主要的区别是监理的分工不同、对象不同",{"key":24,"text":507,"correct":22},"设备工程监理的空间跨度远远大于建设工程监理",{"key":27,"text":509,"correct":22},"两者对监理人员的专业背景和专业能力要求上也有很大不同",{"key":30,"text":511,"correct":32},"无论是哪一种类型的建设项目，建设监理与设备监理在项目管理中的地位是相同的",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":20,"analysis":33},930277,"设备是指工业企业中用于满足生产需要、形成生产能力的机械、装置、电气、机具等单体设备及成套系统，以及与之配套的( )的硬件和支持其运行的配套软件。",[516,518,520,522],{"key":20,"text":517,"correct":32},"信息系统",{"key":24,"text":519,"correct":22},"管理系统",{"key":27,"text":521,"correct":22},"网络系统",{"key":30,"text":523,"correct":22},"自动化系统",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":27,"analysis":33},930278,"下列关于项目控制方法的说法，正确的是( )。",[528,530,532,534],{"key":20,"text":529,"correct":22},"采用被动控制方法时，应首先收集实际数据",{"key":24,"text":531,"correct":22},"偏差分析是主动控制的基本步骤之一",{"key":27,"text":533,"correct":32},"主动控制可以预防偏差出现",{"key":30,"text":535,"correct":22},"前馈控制属于被动控制",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":27,"analysis":33},930279,"不属于设备工程质量管理中应遵循的原则的是( )。",[540,542,544,546],{"key":20,"text":541,"correct":22},"以预防为主，过程与结果并重",{"key":24,"text":543,"correct":22},"满足顾客质量要求，坚持持续改进",{"key":27,"text":545,"correct":32},"坚持技术与经济的统一",{"key":30,"text":547,"correct":22},"坚持质量管理的系统过程，实施重点控制",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":20,"analysis":33},930280,"所谓监理人员合理配置，就是要求( )与项目涉及的专业及专业重要程度相匹配。",[552,554,556,558],{"key":20,"text":553,"correct":32},"人员专业配置",{"key":24,"text":555,"correct":22},"人员规模配置",{"key":27,"text":557,"correct":22},"技术人员资质",{"key":30,"text":559,"correct":22},"管理人员数量",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":24,"analysis":33},930281,"由于质量要求不断变化，因此质量管理的内容和方法具有( )的特点。",[564,566,568,570],{"key":20,"text":565,"correct":22},"稳定性",{"key":24,"text":567,"correct":32},"动态性",{"key":27,"text":569,"correct":22},"固定性",{"key":30,"text":571,"correct":22},"确定性",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":20,"analysis":33},930282,"总监理工程师应掌握的信息至少包括监理目标、监理范围和( )等。",[576,578,580,582],{"key":20,"text":577,"correct":32},"监理合同",{"key":24,"text":579,"correct":22},"具体专业计划和执行信息",{"key":27,"text":581,"correct":22},"所采用的专业标准",{"key":30,"text":583,"correct":22},"工作地点的具体状况",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":20,"analysis":33},930283,"根据一般设备的安装、调试过程监理工作流程，在编制了监理细则后，安装过程监理开始之丽，需要完成的工作有( )。",[588,590,592,594],{"key":20,"text":589,"correct":32},"基础验收监理",{"key":24,"text":591,"correct":22},"编制监理规划",{"key":27,"text":593,"correct":22},"熟悉设计图纸文件",{"key":30,"text":595,"correct":22},"整理监理资料",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":24,"analysis":33},930284,"在设备工程监理服务规范中体现顾客要求的特性是( )。",[600,602,604,606],{"key":20,"text":601,"correct":22},"风险特性",{"key":24,"text":603,"correct":32},"技术特性",{"key":27,"text":605,"correct":22},"经济特性",{"key":30,"text":607,"correct":22},"组织特性",{"id":609,"libraryId":5,"type":15,"typeLabel":16,"stem":610,"options":611,"answer":30,"analysis":33},930285,"下列关于设备监理质量控制规范相关内容的说法，正确的是( )。",[612,614,616,618],{"key":20,"text":613,"correct":22},"应确定每一项服务特性的验收标准",{"key":24,"text":615,"correct":22},"应识别监督管理的重点过程",{"key":27,"text":617,"correct":22},"应明确服务提供的程序和方法",{"key":30,"text":619,"correct":32},"应规定对服务和服务提供特性进行评价和控制的程序和方法",[621,624,627,630,633,636],{"id":15,"name":622,"category":7,"favorite":623},"领导干部任职前廉政法规知识测试题",92,{"id":625,"name":626,"category":7,"favorite":15},595,"建筑结构与设备",{"id":628,"name":629,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":631,"name":632,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":634,"name":635,"category":7,"favorite":8},534,"BIM工程师",{"id":637,"name":635,"category":7,"favorite":8},535]