[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-601-14":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":542},{"id":5,"name":6,"category":7,"favorite":8},601,"设备工程监理基础及相关知识","建筑工程",0,14,50,686,[13,38,53,68,83,98,113,128,143,157,171,186,201,215,230,245,260,274,289,304,318,332,346,360,374,388,402,417,431,444,458,472,486,500,514,528],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},930536,2,"多选题","下列关于风险和风险管理的说法，正确的有( )。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","风险是一种确定事件",false,{"key":24,"text":25,"correct":22},"B","风险造成的影响是负面的",{"key":27,"text":28,"correct":29},"C","风险是预期和实际间的偏差",true,{"key":31,"text":32,"correct":29},"D","对待风险可以主动干预",{"key":34,"text":35,"correct":29},"E","风险是一种客观存在","CDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},930537,"设箭监理大纲的编制依据包括( )。",[42,44,46,48,50],{"key":20,"text":43,"correct":29},"设备工程项目概况",{"key":24,"text":45,"correct":29},"设备工程项目监理任务的招标文件",{"key":27,"text":47,"correct":29},"业主所要达到的监理目标和要求",{"key":31,"text":49,"correct":22},"设备工程项目监理合同",{"key":34,"text":51,"correct":22},"设备工程项目监理实施细则","ABC",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},930538,"为建设高效团队，项目监理机构应具备的特征至少包括( )。",[57,59,61,63,65],{"key":20,"text":58,"correct":29},"清晰的目标",{"key":24,"text":60,"correct":29},"良好的沟通",{"key":27,"text":62,"correct":22},"冗余的职能备份",{"key":31,"text":64,"correct":22},"强力的领导和服务",{"key":34,"text":66,"correct":22},"只依靠内部力量","AB",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},930539,"取得注册设备监理师执业资格，是( )的必备条件。",[72,74,76,78,80],{"key":20,"text":73,"correct":29},"设立设备工程项目监理机构",{"key":24,"text":75,"correct":29},"担任设备工程项目监理机构技术负责人",{"key":27,"text":77,"correct":22},"从事设备监理工作",{"key":31,"text":79,"correct":22},"担任设备监理单位负责人",{"key":34,"text":81,"correct":29},"独立执行监理业务","ABE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},930540,"组织是一切管理的基础，构成组织的基本要素包括( )。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"组织规划",{"key":24,"text":90,"correct":29},"特定的目标",{"key":27,"text":92,"correct":22},"组织结构的特点",{"key":31,"text":94,"correct":29},"成员的职务和权力",{"key":34,"text":96,"correct":22},"组织的层次","BD",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},930541,"按项目目标划分，可以将项目计划分为( )。",[102,104,106,108,110],{"key":20,"text":103,"correct":29},"进度计划",{"key":24,"text":105,"correct":22},"概念计划",{"key":27,"text":107,"correct":29},"质量计划",{"key":31,"text":109,"correct":29},"投资(费用)计划",{"key":34,"text":111,"correct":22},"详细计划","ACD",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":127,"analysis":37},930542,"ISO14000系列标准作为一个多标准组合系统，按标准性质可分为三类，其中第二类基本标准包括( )。",[117,119,121,123,125],{"key":20,"text":118,"correct":22},"术语标准",{"key":24,"text":120,"correct":29},"环境管理体系",{"key":27,"text":122,"correct":29},"环境管理规范",{"key":31,"text":124,"correct":29},"环境管理应用指南",{"key":34,"text":126,"correct":22},"环境标志","BCD",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":142,"analysis":37},930543,"申请设备工程监理单位资格所需提交的文件包括( )。",[132,134,136,138,140],{"key":20,"text":133,"correct":29},"营业执照",{"key":24,"text":135,"correct":29},"质量管理手册程序文件目录",{"key":27,"text":137,"correct":29},"注册资金证明",{"key":31,"text":139,"correct":22},"单位负责人证明材料",{"key":34,"text":141,"correct":29},"单位的设施和设备情况详细说明","ABCE",{"id":144,"libraryId":5,"type":15,"typeLabel":16,"stem":145,"options":146,"answer":112,"analysis":37},930544,"关于质量计划的下列说法中，正确的有( )。",[147,149,151,153,155],{"key":20,"text":148,"correct":29},"质量计划是对特定的项目.产品.过程或合同，规定由谁及何时应使用哪些程序和相关资源的文件",{"key":24,"text":150,"correct":22},"质量计划是经委托人认可.总监理工程师批准，用来对具体监理项目的服务过程和资源做出规定的文件",{"key":27,"text":152,"correct":29},"可编制总体质量计划，也可编写有关单项活动的质量计划",{"key":31,"text":154,"correct":29},"质量计划的详细程度与委托人的要求.运作的方式和监理项目的复杂程度相一致",{"key":34,"text":156,"correct":22},"质量计划应作为独立的文件编写，实际应用中，质量计划可能被称为监理规划",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":142,"analysis":37},930545,"在项目实施过程中，可能引起对设备的设计进行变更或修改的原因包括( )。",[161,163,165,167,169],{"key":20,"text":162,"correct":29},"设计评审、设计验证或设计确认要求变更",{"key":24,"text":164,"correct":29},"业主或分承包商对设备的性能或可靠性有新的要求",{"key":27,"text":166,"correct":29},"有关健康、安全、材料使用方面的法规要求发生了变化",{"key":31,"text":168,"correct":22},"监理人员要求更改",{"key":34,"text":170,"correct":29},"纠正措施或预防措施要求更改",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":185,"analysis":37},930546,"团队建设过程中，在团队核心人物亲和力差的情况下的应对措施包括( )。",[175,177,179,181,183],{"key":20,"text":176,"correct":22},"要在项目开始时就告诉管理层需要何种资源",{"key":24,"text":178,"correct":29},"分配\u002F协商任务并注意在项目生命周期中未曾预料的任务冲突",{"key":27,"text":180,"correct":22},"团队负责人加强管理和技术专业知识的学习",{"key":31,"text":182,"correct":22},"拟订项目的工作计划，并且把这个计划灌输给整个团队",{"key":34,"text":184,"correct":29},"确定如何才能把整个项目分为最恰当的子系统和子任务","BE",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":200,"analysis":37},930547,"下列关于设备监理记录的说法，正确的有( )。",[190,192,194,196,198],{"key":20,"text":191,"correct":22},"设备监理记录要求是设备监理服务实现过程的输出",{"key":24,"text":193,"correct":22},"设备监理记录的格式应在监理细则中规定",{"key":27,"text":195,"correct":29},"设备监理记录是提供监理检查、验证等证据",{"key":31,"text":197,"correct":22},"设备监理记录是在监理服务策划过程中形成的",{"key":34,"text":199,"correct":29},"设备工程变更通知、支付证书均属于设备监理记录","CE",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":200,"analysis":37},930548,"项目监理机构内部的沟通包括( )。",[205,207,209,211,213],{"key":20,"text":206,"correct":22},"充分理解委托方的期望和要求",{"key":24,"text":208,"correct":22},"监理交底制度",{"key":27,"text":210,"correct":29},"向监理单位的报告和请示制度",{"key":31,"text":212,"correct":22},"建立监理方的反馈制度",{"key":34,"text":214,"correct":29},"项目监理机构内部工作会议制度",{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":229,"analysis":37},930549,"根据设备工程信息的来源，项目信息可分为( )。",[219,221,223,225,227],{"key":20,"text":220,"correct":22},"自上而F的信息",{"key":24,"text":222,"correct":22},"自下而上的信息",{"key":27,"text":224,"correct":29},"外生信息",{"key":31,"text":226,"correct":29},"内生信息",{"key":34,"text":228,"correct":22},"横向流动的信息","CD",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":244,"analysis":37},930550,"根据《设备工程监理规范》，设备监理单位在设备设计过程中的工作内容有( )。",[234,236,238,240,242],{"key":20,"text":235,"correct":29},"参与审查被监理单位提交的设计总体方案及进度计划",{"key":24,"text":237,"correct":29},"对设计关键阶段和关键节点进行监督和见证",{"key":27,"text":239,"correct":29},"检查各专业之间的组织接口和技术接口情况",{"key":31,"text":241,"correct":29},"适时对项目质量计划、有关质量体系文件执行情况进行抽查",{"key":34,"text":243,"correct":22},"当出现不合格时，要求被监理单位立即返工","ABCD",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":259,"analysis":37},930551,"设备制造工艺方案应经过( )审核批准后实施。",[249,251,253,255,257],{"key":20,"text":250,"correct":22},"业主代表",{"key":24,"text":252,"correct":29},"总工程师",{"key":27,"text":254,"correct":29},"技术负责人",{"key":31,"text":256,"correct":22},"设备监理工程师",{"key":34,"text":258,"correct":22},"设备制造承包商","BC",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":52,"analysis":37},930552,"按项目阶段式管理划分的项目管理模式有( )管理模式。",[264,266,268,270,272],{"key":20,"text":265,"correct":29},"项目设计",{"key":24,"text":267,"correct":29},"项目承建",{"key":27,"text":269,"correct":29},"项目制造",{"key":31,"text":271,"correct":22},"项目局部过程管理",{"key":34,"text":273,"correct":22},"专业承包",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":288,"analysis":37},930553,"在我国设备工程监理管理体制中，负责对注册设备监理师注册后执业情况进行监督和检查的部门有( )。",[278,280,282,284,286],{"key":20,"text":279,"correct":29},"国家人力资源和社会保障部",{"key":24,"text":281,"correct":29},"国家质量监督检验检疫总局",{"key":27,"text":283,"correct":22},"国务院有关行业管理部门",{"key":31,"text":285,"correct":29},"各省、自治区、直辖市人事部门",{"key":34,"text":287,"correct":22},"中国设备监理协会","ABD",{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":303,"analysis":37},930554,"参加注册设备监理师执业资格考试的条件，除要求为中华人民共和国公民，遵守国家法律、法规外，还要求( )。",[293,295,297,299,301],{"key":20,"text":294,"correct":22},"从事工程技术或工程经济工作",{"key":24,"text":296,"correct":29},"按照《工程技术人员职务试行条例》规定被评聘为工程师以上(含工程师)专业技术职务",{"key":27,"text":298,"correct":22},"热爱本职工作",{"key":31,"text":300,"correct":29},"具有一定的工程技术方面的专业学历",{"key":34,"text":302,"correct":29},"具备一定的从事设备工程专业的工作经历","BDE",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":127,"analysis":37},930555,"在设备工程活动中，设备监理单位是最适宜的组织协调者，原因包括( )。",[308,310,312,314,316],{"key":20,"text":309,"correct":22},"设备监理单位具有专职的协调员",{"key":24,"text":311,"correct":29},"设备监理单位拥有设备监理合同及有关的法律、法规授予的权力",{"key":27,"text":313,"correct":29},"设备监理单位是业主委托并授权的、在设备工程项目现场唯一的管理者",{"key":31,"text":315,"correct":29},"设备监理人员一般比业主方的管理人员有更丰富的管理经验",{"key":34,"text":317,"correct":22},"总监理工程师具有最佳的协调能力",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":229,"analysis":37},930556,"监理资料的日常管理中，记录控制要点包括( )",[322,324,326,328,330],{"key":20,"text":323,"correct":22},"应识别文件的有效性",{"key":24,"text":325,"correct":22},"项目监理机构发文应规范",{"key":27,"text":327,"correct":29},"记录应保持清晰、易于识别和检索",{"key":31,"text":329,"correct":29},"记录应真实、准确、严谨、及时，不应随意涂改",{"key":34,"text":331,"correct":22},"监理文件的传阅。由总监理工程师或其授权人确定文件是否要传阅",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":112,"analysis":37},930557,"采用FMEA方法编写制造工艺方案的目的是( )。",[336,338,340,342,344],{"key":20,"text":337,"correct":29},"将全部过程形成文件。",{"key":24,"text":339,"correct":22},"最大限度地降低后期更改的危机",{"key":27,"text":341,"correct":29},"确定能够消除或减少潜在失效发生机会的措施；",{"key":31,"text":343,"correct":29},"认可并评价产品／过程中的潜在失效的可能以及该失效的后果；",{"key":34,"text":345,"correct":22},"减少或消除实施可能会带来的更大隐患的预防\u002F纠正性更改的机会",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":97,"analysis":37},930558,"下列属于设备工程监理的概念要点的包括( )。",[350,352,354,356,358],{"key":20,"text":351,"correct":22},"具有相应资质的建设项目监理单位",{"key":24,"text":353,"correct":29},"接受委托方的委托",{"key":27,"text":355,"correct":22},"按照委托方与承包方签订的设备工程合同",{"key":31,"text":357,"correct":29},"依据国家有关法律、法规、规章、技术标准",{"key":34,"text":359,"correct":22},"对设备形成的全过程和\u002F或最终形成的结果提供咨询或管理服务",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":127,"analysis":37},930559,"设备监理服务技术特性或要素应满足的要求包括( )。",[364,366,368,370,372],{"key":20,"text":365,"correct":22},"项目监理机构组织形式设置合理",{"key":24,"text":367,"correct":29},"项目合同行为受控",{"key":27,"text":369,"correct":29},"提供的监理服务可靠",{"key":31,"text":371,"correct":29},"项目合同目标受控",{"key":34,"text":373,"correct":22},"监理服务过程明确",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":288,"analysis":37},930560,"中国设备监理协会在组织专家进行设备监理单位资格评审时，采用的评审方式有( )。",[378,380,382,384,386],{"key":20,"text":379,"correct":29},"文件评审",{"key":24,"text":381,"correct":29},"现场评审",{"key":27,"text":383,"correct":22},"文件审查",{"key":31,"text":385,"correct":29},"见证评审",{"key":34,"text":387,"correct":22},"现场审查",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":303,"analysis":37},930561,"属于企业管理费的有( )。",[392,394,396,398,400],{"key":20,"text":393,"correct":22},"危险作业意外伤害保险费",{"key":24,"text":395,"correct":29},"6个月以上的病假人员工资",{"key":27,"text":397,"correct":22},"生产工人休假期间的工资",{"key":31,"text":399,"correct":29},"现场管理人员工资",{"key":34,"text":401,"correct":29},"职工探亲路费",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":416,"analysis":37},930562,"可行性研究的内容包括( )。",[406,408,410,412,414],{"key":20,"text":407,"correct":29},"场址选择",{"key":24,"text":409,"correct":29},"环境影响评价",{"key":27,"text":411,"correct":22},"施工图预算",{"key":31,"text":413,"correct":29},"社会评价",{"key":34,"text":415,"correct":29},"风险评价","ABDE",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":97,"analysis":37},930563,"设备工程监理服务的绩效体现为项目合同目标实现的( )。",[421,423,425,427,429],{"key":20,"text":422,"correct":22},"策划",{"key":24,"text":424,"correct":29},"结果",{"key":27,"text":426,"correct":22},"措施",{"key":31,"text":428,"correct":29},"贡献",{"key":34,"text":430,"correct":22},"质量",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":244,"analysis":37},930564,"制定设备监理实施细则的依据包括( )。",[435,436,438,440,442],{"key":20,"text":49,"correct":29},{"key":24,"text":437,"correct":29},"设备监理规划",{"key":27,"text":439,"correct":29},"设备工程承包合同",{"key":31,"text":441,"correct":29},"国家的技术规范和质量标准",{"key":34,"text":443,"correct":22},"合格工程审核签证记录",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":457,"analysis":37},930565,"按项目计划的制订过程划分，可以将项目计划分为( )。",[448,450,452,454,455],{"key":20,"text":449,"correct":22},"竞争性计划",{"key":24,"text":451,"correct":22},"指导性计划",{"key":27,"text":453,"correct":22},"操作性计划",{"key":31,"text":105,"correct":29},{"key":34,"text":456,"correct":29},"滚动计划","DE",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":185,"analysis":37},930566,"下列不属于设备工程所具备的特点的是( )。",[462,464,466,468,470],{"key":20,"text":463,"correct":22},"时空跨度大",{"key":24,"text":465,"correct":29},"大型化、高速化",{"key":27,"text":467,"correct":22},"形式多样、规则性差",{"key":31,"text":469,"correct":22},"周期长，人财物投入量大",{"key":34,"text":471,"correct":29},"专业化、自动化",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":244,"analysis":37},930567,"按照项目管理的职能，没备工程项目信息可分为( )信息等。",[476,478,480,482,484],{"key":20,"text":477,"correct":29},"投资控制",{"key":24,"text":479,"correct":29},"进度控制",{"key":27,"text":481,"correct":29},"质量控制",{"key":31,"text":483,"correct":29},"合同管理",{"key":34,"text":485,"correct":22},"资料管理",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":142,"analysis":37},930568,"在设备工程质量形成过程中，对设备工程质量的影响是多方面的，它包括( )。",[490,492,494,496,498],{"key":20,"text":491,"correct":29},"人的因素",{"key":24,"text":493,"correct":29},"材料因素",{"key":27,"text":495,"correct":29},"环境因素",{"key":31,"text":497,"correct":22},"技术环境",{"key":34,"text":499,"correct":29},"工艺方法",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":200,"analysis":37},930569,"设备工程监理的概念根据设备工程监理的现状和未来发展，在《设备监理管理暂行办法》的基础上进行了扩展，主要反映在设备工程监理的( )。",[504,506,508,510,512],{"key":20,"text":505,"correct":22},"组织机构",{"key":24,"text":507,"correct":22},"合同模式",{"key":27,"text":509,"correct":29},"服务对象",{"key":31,"text":511,"correct":22},"监理方式",{"key":34,"text":513,"correct":29},"监理内容",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":97,"analysis":37},930570,"设备工程监理服务规范中的合同行为受控是指( )。",[518,520,522,524,526],{"key":20,"text":519,"correct":22},"承包商的组织行为受控",{"key":24,"text":521,"correct":29},"承包商的合同行为受控",{"key":27,"text":523,"correct":22},"设备工程监理机构的合同行为受控",{"key":31,"text":525,"correct":29},"承包商之间的关系受控",{"key":34,"text":527,"correct":22},"设备工程监理机构的内部关系受控",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":36,"analysis":37},930571,"设备工程监理单位提供的监理服务一般由( )构成。",[532,534,536,538,540],{"key":20,"text":533,"correct":22},"检验服务",{"key":24,"text":535,"correct":22},"测试服务",{"key":27,"text":537,"correct":29},"核心服务",{"key":31,"text":539,"correct":29},"辅助服务",{"key":34,"text":541,"correct":29},"附加服务",[543,547,550,553,556,559],{"id":544,"name":545,"category":7,"favorite":546},1,"领导干部任职前廉政法规知识测试题",92,{"id":548,"name":549,"category":7,"favorite":544},595,"建筑结构与设备",{"id":551,"name":552,"category":7,"favorite":544},715,"招标采购专业知识与法律法规",{"id":554,"name":555,"category":7,"favorite":544},848,"市政方向-通用基础",{"id":557,"name":558,"category":7,"favorite":8},534,"BIM工程师",{"id":560,"name":558,"category":7,"favorite":8},535]