[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930552":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},930552,601,2,"多选题","按项目阶段式管理划分的项目管理模式有( )管理模式。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","项目设计",true,{"key":16,"text":17,"correct":14},"B","项目承建",{"key":19,"text":20,"correct":14},"C","项目制造",{"key":22,"text":23,"correct":24},"D","项目局部过程管理",false,{"key":26,"text":27,"correct":24},"E","专业承包","ABC","",{"id":6,"name":31,"category":32,"favorite":33},"设备工程监理基础及相关知识","建筑工程",0]