[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930551":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},930551,601,2,"多选题","设备制造工艺方案应经过( )审核批准后实施。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","业主代表",false,{"key":16,"text":17,"correct":18},"B","总工程师",true,{"key":20,"text":21,"correct":18},"C","技术负责人",{"key":23,"text":24,"correct":14},"D","设备监理工程师",{"key":26,"text":27,"correct":14},"E","设备制造承包商","BC","",{"id":6,"name":31,"category":32,"favorite":33},"设备工程监理基础及相关知识","建筑工程",0]