[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930535":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},930535,601,2,"多选题","在启动阶段确定项目范围工作应包括( )等工作。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","范围定义",true,{"key":16,"text":17,"correct":18},"B","项目约束",false,{"key":20,"text":21,"correct":14},"C","范围确认",{"key":23,"text":24,"correct":18},"D","机会分析",{"key":26,"text":27,"correct":18},"E","资源配备","AC","",{"id":6,"name":31,"category":32,"favorite":33},"设备工程监理基础及相关知识","建筑工程",0]