[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930510":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},930510,601,2,"多选题","下列关于设备制造过程中不合格品控制活动的说法，正确的有( )。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","发现和标识不合格品",true,{"key":16,"text":17,"correct":14},"B","记录和隔离不合格品",{"key":19,"text":20,"correct":14},"C","评审和处置不合格品",{"key":22,"text":23,"correct":24},"D","只要经返工处理后，不合格品就可转入下道工序",false,{"key":26,"text":27,"correct":14},"E","制定纠正措施并实施和验证","ABCE","",{"id":6,"name":31,"category":32,"favorite":33},"设备工程监理基础及相关知识","建筑工程",0]