[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930490":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},930490,601,2,"多选题","按表达方法不同，设备工程进度计划可分为( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","总进度计划",false,{"key":16,"text":17,"correct":18},"B","进度表",true,{"key":20,"text":21,"correct":14},"C","设计进度计划",{"key":23,"text":24,"correct":18},"D","横道图",{"key":26,"text":27,"correct":18},"E","网络图","BDE","",{"id":6,"name":31,"category":32,"favorite":33},"设备工程监理基础及相关知识","建筑工程",0]