[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930485":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},930485,601,2,"多选题","作为风险识别的成果，项目风险清单的内容包括( )。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","风险编码",true,{"key":16,"text":17,"correct":14},"B","风险因素",{"key":19,"text":20,"correct":21},"C","风险概率",false,{"key":23,"text":24,"correct":21},"D","风险对策",{"key":26,"text":27,"correct":14},"E","风险后果","ABE","",{"id":6,"name":31,"category":32,"favorite":33},"设备工程监理基础及相关知识","建筑工程",0]