[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930481":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},930481,601,2,"多选题","在2000版PMBOK体系中，项目沟通管理的主要过程包括( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","编制沟通计划",true,{"key":16,"text":17,"correct":18},"B","合同管理",false,{"key":20,"text":21,"correct":14},"C","信息分发",{"key":23,"text":24,"correct":14},"D","执行状况报告",{"key":26,"text":27,"correct":14},"E","管理收尾","ACDE","",{"id":6,"name":31,"category":32,"favorite":33},"设备工程监理基础及相关知识","建筑工程",0]