[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930474":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},930474,601,2,"多选题","引起工程项目风险事件发生的基本因素主要包括( )。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","技术因素",true,{"key":16,"text":17,"correct":14},"B","人员因素",{"key":19,"text":20,"correct":21},"C","合同因素",false,{"key":23,"text":24,"correct":14},"D","设备因素",{"key":26,"text":27,"correct":21},"E","资金因素","ABD","",{"id":6,"name":31,"category":32,"favorite":33},"设备工程监理基础及相关知识","建筑工程",0]