[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930471":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},930471,601,2,"多选题","过程化管理方法PDCA循环包括的主要阶段有( )。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","计划",true,{"key":16,"text":17,"correct":14},"B","检查",{"key":19,"text":20,"correct":21},"C","改进",false,{"key":23,"text":24,"correct":14},"D","处理",{"key":26,"text":27,"correct":14},"E","实施","ABDE","",{"id":6,"name":31,"category":32,"favorite":33},"设备工程监理基础及相关知识","建筑工程",0]