[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930464":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},930464,601,2,"多选题","设备工程进度管理是指对设备工程各阶段的工作内容、工作顺序和工作持续时间根据其( )，编制计划并付诸实施、检查和调整的全部过程。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","进度总目标",true,{"key":16,"text":17,"correct":18},"B","质量总目标",false,{"key":20,"text":21,"correct":18},"C","造价总目标",{"key":23,"text":24,"correct":18},"D","安全总目标",{"key":26,"text":27,"correct":14},"E","资源优化配置原则","AE","",{"id":6,"name":31,"category":32,"favorite":33},"设备工程监理基础及相关知识","建筑工程",0]