[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930419":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},930419,601,2,"多选题","对设备形成的全过程及设备形成过程的结果的监理主要涉及( )。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","设备工程的质量、进度和投资方面",true,{"key":16,"text":17,"correct":14},"B","设备工程的安全方面",{"key":19,"text":20,"correct":21},"C","设备工程的维护、修理过程",false,{"key":23,"text":24,"correct":21},"D","承包商在设备形成过程中的履约行为",{"key":26,"text":27,"correct":21},"E","设备的改造和更新过程","AB","",{"id":6,"name":31,"category":32,"favorite":33},"设备工程监理基础及相关知识","建筑工程",0]