[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930411":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},930411,601,2,"多选题","按项目风险管理对策的时间性，项目风险管理的对策可划分为( )。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","消极风险或威胁的应对策略",false,{"key":16,"text":17,"correct":14},"B","积极风险或机会的应对策略",{"key":19,"text":20,"correct":21},"C","预防性对策",true,{"key":23,"text":24,"correct":21},"D","应急对策",{"key":26,"text":27,"correct":14},"E","风险转移","CD","",{"id":6,"name":31,"category":32,"favorite":33},"设备工程监理基础及相关知识","建筑工程",0]