[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930354":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},930354,601,2,"多选题","采购工作从采购部门收到第一批请购文件开始，要经历( )等环节。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","筹资",false,{"key":16,"text":17,"correct":18},"B","催交",true,{"key":20,"text":21,"correct":18},"C","检验",{"key":23,"text":24,"correct":18},"D","运输",{"key":26,"text":27,"correct":14},"E","预算","BCD","",{"id":6,"name":31,"category":32,"favorite":33},"设备工程监理基础及相关知识","建筑工程",0]