[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930347":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},930347,601,2,"多选题","下列关于投资管理目标说法正确的是( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","投资管理目标的设置应是随着设备工程建设实践的不断深入而分层次设置的。",true,{"key":16,"text":17,"correct":18},"B","设备工程施工图预算是设备初步设计的投资管理目标",false,{"key":20,"text":21,"correct":14},"C","在工程建设伊始，只能设置一个初步的投资管理目标，这就是设备工程投资估算",{"key":23,"text":24,"correct":14},"D","工程设计概算与预算是设备安装工程合同价的投资管理目标",{"key":26,"text":27,"correct":14},"E","设备制造和安装工程合同价格则是设备制造和安装过程中的投资管理目标","ACDE","",{"id":6,"name":31,"category":32,"favorite":33},"设备工程监理基础及相关知识","建筑工程",0]