[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930335":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},930335,601,2,"多选题","对设备制造过程中不合格品的控制活动，下面说法中，正确的有( )。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","处置不合格品",true,{"key":16,"text":17,"correct":14},"B","制定纠正措施",{"key":19,"text":20,"correct":21},"C","评价不合格品",false,{"key":23,"text":24,"correct":14},"D","发现和标识不合格品",{"key":26,"text":27,"correct":14},"E","记录和隔离不合格品","ABDE","",{"id":6,"name":31,"category":32,"favorite":33},"设备工程监理基础及相关知识","建筑工程",0]