[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930333":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},930333,601,2,"多选题","项目监理机构与委托人的沟通机制包括( )。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","充分理解委托方的期望和要求，并体现在监理项目质量计划或工作计划中",true,{"key":16,"text":17,"correct":14},"B","监理项目质量计划实施前应主动向委托方汇报，并取得委托方认可",{"key":19,"text":20,"correct":14},"C","应明确能代表委托方且有权作出决策的负责人",{"key":22,"text":23,"correct":24},"D","应建立被监理方向委托方的报告制度",false,{"key":26,"text":27,"correct":14},"E","应建立监理方向委托方的报告制度","ABCE","",{"id":6,"name":31,"category":32,"favorite":33},"设备工程监理基础及相关知识","建筑工程",0]