[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930314":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},930314,601,1,"单选题","以下反映投资、进度、质量目标的矛盾关系的有( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","进度加快，及早发挥效益",false,{"key":16,"text":17,"correct":18},"B","进度加快，增大投资",true,{"key":20,"text":21,"correct":14},"C","提高质量减少返工损失和日常保护费用",{"key":23,"text":24,"correct":14},"D","进度加快，提高质量，减少返工","",{"id":6,"name":27,"category":28,"favorite":29},"设备工程监理基础及相关知识","建筑工程",0]