[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930302":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},930302,601,1,"单选题","实施设备工程项目目标管理时，上级和下级需要就实现各项目标所需的条件以及实现目标后的奖惩事宜达成协议，这是目标管理( )阶段需要完成的内容。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","目标的设置",true,{"key":16,"text":17,"correct":18},"B","目标过程的管理",false,{"key":20,"text":21,"correct":18},"C","目标管理的测定",{"key":23,"text":24,"correct":18},"D","目标管理的评价","",{"id":6,"name":27,"category":28,"favorite":29},"设备工程监理基础及相关知识","建筑工程",0]