[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930249":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},930249,601,1,"单选题","当设备工程项目有多个监理单位共同监理时，监理单位之间应建立( )的协调制度，共同完成监理任务。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","监理单位负责人",false,{"key":16,"text":17,"correct":18},"B","总监理工程师",true,{"key":20,"text":21,"correct":14},"C","专业监理工程师",{"key":23,"text":24,"correct":14},"D","总监理工程师代表","",{"id":6,"name":27,"category":28,"favorite":29},"设备工程监理基础及相关知识","建筑工程",0]