[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-930192":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},930192,601,1,"单选题","根据项目目标控制原理，在目标控制实施过程前，分析可能产生偏差的因素，在偏差出现前采取措施，以消除产生偏差的隐患。这种项目目标控制方式是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","反馈控制",false,{"key":16,"text":17,"correct":18},"B","主动控制",true,{"key":20,"text":21,"correct":14},"C","闭环控制",{"key":23,"text":24,"correct":14},"D","现代控制","",{"id":6,"name":27,"category":28,"favorite":29},"设备工程监理基础及相关知识","建筑工程",0]